ABB is delivering a new distributed control system for the desalination plant at the Dubai Aluminium (DUBAL) smelter complex in Dubai. The solution is one of several that ABB has recently provided for this vast power, water and production complex, widely considered the industrial flagship of Dubai.
DUBAL operates one of the largest single-site aluminum production complexes in the world. Built on a 480 hectare site, the state-of-the-art smelter complex comprises 1,573 reduction cells arranged in seven potlines, a 2,350 megawatt power plant, a desalination plant that produces 113.5 million liters of distilled and potable water a day, and various other facilities including a carbon plant, casting houses and port. The smelter produces more than one million tons of molten aluminum a year.